GPU Colocation: Power-Ready Racks for H100/B200 Clusters
You own the GPUs. We find the rack: 40 kW air-cooled to 120 kW liquid-cooled positions in Dallas, Ashburn, the Pacific Northwest, the Bay Area, and secondary US markets. One request, quotes from multiple facilities within one business day.
- $120–$350 per kW per month across the primary US markets, per published 2026 rate guides. See pricing by market
- Liquid-cooled and rear-door heat exchanger racks for DGX H100, DGX B200, and GB200 NVL72
- InfiniBand and 400G Ethernet cross-connects, contiguous rack positions
- No fee to you; the facility pays GYGO
Deploying H100s specifically? H100 colocation requirements
Get quotes from multiple facilities within one business day
Tell us your power requirement and region. We match it against partner facilities and send you comparable quotes, free of charge.
Colocation for GPU clusters vs standard colocation
Standard enterprise colocation quotes 5–10 kW per rack and puts your cabinets wherever space is free. Uptime Institute’s 2025 global survey puts the average modal rack density, excluding the few high-density sites, at 7.5 kW, right in the middle of that band. A training cluster breaks both assumptions.
A single DGX H100 pulls about 10.2 kW and a DGX B200 about 14.3 kW. Four H100 systems fill a 40 kW air-cooled rack. A GB200 NVL72 needs roughly 120 kW in one rack and has no air-cooled option, so a building without direct-to-chip liquid cooling can’t take the deployment at all.
Placement matters as much as power. InfiniBand and 400G Ethernet links between racks have to stay inside cable-length limits, so the facility has to hand you contiguous rack positions instead of whatever is free across two halls.
Most buildings can’t do either. In the same Uptime survey, 82% of operators said their densest rack sits below 30 kW, so a 120 kW liquid-cooled deployment rules out the large majority of the market before you start negotiating. That is why we start from your kW and your topology rather than from a list of buildings.
What GYGO brokers
Colocation is the core. If your plan also involves renting, buying, or monetizing GPUs, the same team handles it.
Place (colocation)
Rack space, power, cooling, and cross-connects for GPU clusters you own. This page.
Rent
Compare cloud and bare-metal GPU providers by workload, latency, or cost.
Buy
Source H100, H200, and B200 systems through value-added resellers.
Invest
Turn idle GPU hardware into revenue through leasing and compute programs.
Power and density: air vs liquid
The rack you need depends on the systems you are landing. Most facilities quote per kW, so the density decides both the building and the price.
- About four DGX H100 systems (10.2 kW each) or two to three DGX B200 (14.3 kW each) per rack
- Widely available in Dallas, Ashburn, and Pacific Northwest facilities
- Indicative $4,800–$14,000 per rack per month at $120–$350/kW
- Required for GB200 NVL72 (about 120 kW per rack) and dense B200 deployments
- Scarcer inventory; expect longer lead times. Liquid-ready 20–40 kW racks publish at $130–$400/kW including the premium
- Indicative $14,400–$42,000 per rack per month at the air-cooled $120–$350/kW; no guide prices 100 kW+ separately
GPU colocation cost by market
Air-cooled $/kW/month (colocation MRC) as printed in published 2026 rate guides. Full table with liquid-cooled ranges, hidden costs, sources and contract terms on the GPU colocation pricing page.
Deep high-density inventory, competitive power, central US latency.
The largest data center market in the world (CBRE, Q1 2026); capacity is tight and priced accordingly.
Low-cost hydro power; strong value for training clusters that tolerate distance.
Premium for proximity to AI teams; limited liquid-cooled capacity.
Colorado and the Dakotas as published examples; longer lead times for 100 kW+ racks.
Ranges as printed in published 2026 rate guides, read 13 October 2026: QuoteColo (AI colocation pricing, 23 March 2026; GPU colocation and liquid-cooled colocation guides, 2026), Inflect (1 April 2026), CBRE (26 February 2026) and Digital Realty's Q2 2026 filing (23 July 2026). Indicative only; the facility's quote governs.
How it works
- 1
Tell us your kW, region, and timeline
One form. Power requirement, preferred region, and when the hardware lands. GPU model and interconnect help but are optional.
- 2
We collect quotes from matching facilities
We check partner data centers with the density and cooling you need and return comparable quotes within one business day.
- 3
You compare and sign with the facility
Pick the quote that fits. You contract directly with the operator. GYGO is paid by the facility, not by you.