A DGX H100 draws about 10.2 kW at full load, so four systems fill a 40 kW air-cooled rack. Training clusters also need InfiniBand NDR or 400G Ethernet between racks and contiguous positions to stay inside cable limits. We match those requirements against partner facilities and return quotes within one business day.
- Per DGX H100
- 10.2 kW
- Rack density
- 40 kW air
- Indicative $/kW/mo
- $120–$350
- Per H100 / month
- ~$150–$450