GPU Colocation Pricing by Market (2026)
What a power-ready GPU rack costs per kW per month in the main US markets, what gets added on top, and how to get real quotes without calling ten facilities.
Get quotes for your kWIndicative $/kW/month by market
Colocation MRC per kW for high-density racks, as printed in published 2026 rate guides. Across the four primary markets, air-cooled racks run $120–$350 per kW per month and liquid-cooled racks $130–$400 including the liquid premium. Cross-connects, remote hands and power billing typically add 25–30% on top.
| Market | Air-cooled $/kW/mo | Liquid-cooled $/kW/mo | 40 kW air rack |
|---|---|---|---|
| Dallas–Fort Worth | $140–$240 | $160–$280 | $5,600–$9,600 |
| Northern Virginia (Ashburn) | $180–$300 | $200–$350 | $7,200–$12,000 |
| Pacific Northwest | $120–$200 | $130–$230 | $4,800–$8,000 |
| Bay Area / Silicon Valley | $200–$350 | $230–$400 | $8,000–$14,000 |
| Secondary US markets | $78–$170 | $110–$200 | $3,120–$6,800 |
Ranges as printed in published 2026 rate guides, read 13 October 2026: QuoteColo (AI colocation pricing, 23 March 2026; GPU colocation and liquid-cooled colocation guides, 2026), Inflect (1 April 2026), CBRE (26 February 2026) and Digital Realty's Q2 2026 filing (23 July 2026). Indicative only; the facility's quote governs.
Air-cooled ranges are QuoteColo’s per-market GPU colocation table (10–50 kW racks, colocation MRC only); liquid-cooled ranges are QuoteColo’s liquid-cooled table for 20–40 kW racks, effective rate including the premium. For calibration: CBRE national average lease rate, H2 2025 was $194.95/kW/month (wholesale asking rate, 250–500 kW requirements); Digital Realty’s Q2 2026 filing shows base rent on new Americas leases under 1 MW at $293/kW/month and over 1 MW at $156/kW/month; and Inflect all-in rate for most deployments is about $250/kW/month once power delivery and services are added.
- QuoteColo, AI Infrastructure Cost: What AI Colocation Pricing Really Looks Like in 2026 (23 March 2026 (Bob Spiegel); read 2026-10-13).
- QuoteColo, GPU Colocation (AI & HPC Hosting): Pricing, Providers, Power Availability (undated; table headed "GPU & AI Colocation Pricing by Market (2026)" and cites CBRE Q1 2026; read 2026-10-13).
- QuoteColo, Liquid Cooled Colocation: Blackwell-Ready Racks (undated; table headed "Liquid Cooled Colocation Pricing by Market (2026)"; read 2026-10-13).
- Inflect, Colocation Pricing: What to Expect for Racks, Cabinets, and Cages in 2026 (1 April 2026 (Chanyu Kuo); read 2026-10-13).
- Digital Realty, Second Quarter 2026 Financial Supplement (Form 8-K, Exhibit 99.1) (23 July 2026; read 2026-10-13).
- CBRE, Silicon Valley's data center supply grew 4% year-over-year as users race to prelease new inventory (26 February 2026; read 2026-10-13).
What that means per rack and per GPU
Fits about four DGX H100 systems. The most common quote for a first GPU deployment.
GB200 NVL72 territory, priced at the air-cooled $/kW. Liquid-ready 20–40 kW racks publish at $130–$400/kW including the premium; no guide prices 100 kW+ separately.
DGX H100 at 10.2 kW for eight GPUs. Compare with on-demand H100 rental on the rental page.
Examples use the primary-market span of $120–$350/kW; multiply a market's row by your kW for a market-specific figure. The monthly $/kW rate for liquid-cooled and air-cooled racks is generally the same (Inflect, 1 April 2026).
Hidden costs the $/kW rate does not include
Ask every facility to itemize these before comparing headline rates.
Cross-connects
Each fiber or copper link to a carrier, cloud on-ramp, or another cage is billed monthly per connection: QuoteColo's 2026 guide puts them at $100–$400 per month each. Training fabrics that span racks may need several.
Remote hands
Reboots, cable swaps, and drive replacements are billed hourly, often with a monthly minimum; QuoteColo's 2026 guide puts remote or smart hands at $150–$300 per hour. Ask for the rate card and whether a block of hours is included.
Liquid-cooling premium
QuoteColo's 2026 guide prices liquid-ready 20–40 kW racks at a 5–30% premium over air by market, and says RDHx or liquid-ready racks can add $500–$2,000 per rack per month at 30 kW and above. Inflect reports the monthly $/kW is generally the same as air at a site already fitted for liquid, with retrofit cost landing in a one-time charge. Ask which model the quote follows.
Setup and installation fees
One-time charges for cage build-out, power whips, PDUs, and initial racking. Negotiable on longer terms.
Minimum term and ramp
Most high-density contracts run 24–36 months. Some operators offer a power ramp so you pay for committed kW as hardware arrives; others bill the full commitment from day one.
Power metering model
Quotes may be for committed (contracted) kW, metered actual draw plus a base fee, or a blended rate. Compare on the same basis before deciding.
Skip the estimates. Get real quotes.
Tell us your kW and region. We check partner facilities with the density you need and send back comparable quotes, itemized, within one business day. You pick one and contract with the facility directly.
- Quotes normalized to the same power model so they compare cleanly
- Cross-connect, remote hands, and setup fees called out separately
- No fee to you; GYGO is paid by the facility
Requirements first? Read the GPU colocation overview or the H100 colocation page.
Get facility quotes within one business day