    GPU Colocation Pricing by Market (2026)

    What a power-ready GPU rack costs per kW per month in the main US markets, what gets added on top, and how to get real quotes without calling ten facilities.

    Get quotes for your kW

    Indicative $/kW/month by market

    Colocation MRC per kW for high-density racks, as printed in published 2026 rate guides. Across the four primary markets, air-cooled racks run $120–$350 per kW per month and liquid-cooled racks $130–$400 including the liquid premium. Cross-connects, remote hands and power billing typically add 25–30% on top.

    Indicative GPU colocation pricing per kW per month by US market, 2026
    MarketAir-cooled $/kW/moLiquid-cooled $/kW/mo40 kW air rack
    Dallas–Fort Worth$140–$240$160–$280$5,600–$9,600
    Northern Virginia (Ashburn)$180–$300$200–$350$7,200–$12,000
    Pacific Northwest$120–$200$130–$230$4,800–$8,000
    Bay Area / Silicon Valley$200–$350$230–$400$8,000–$14,000
    Secondary US markets$78–$170$110–$200$3,120–$6,800

    Ranges as printed in published 2026 rate guides, read 13 October 2026: QuoteColo (AI colocation pricing, 23 March 2026; GPU colocation and liquid-cooled colocation guides, 2026), Inflect (1 April 2026), CBRE (26 February 2026) and Digital Realty's Q2 2026 filing (23 July 2026). Indicative only; the facility's quote governs.

    Air-cooled ranges are QuoteColo’s per-market GPU colocation table (10–50 kW racks, colocation MRC only); liquid-cooled ranges are QuoteColo’s liquid-cooled table for 20–40 kW racks, effective rate including the premium. For calibration: CBRE national average lease rate, H2 2025 was $194.95/kW/month (wholesale asking rate, 250–500 kW requirements); Digital Realty’s Q2 2026 filing shows base rent on new Americas leases under 1 MW at $293/kW/month and over 1 MW at $156/kW/month; and Inflect all-in rate for most deployments is about $250/kW/month once power delivery and services are added.

    What that means per rack and per GPU

    40 kW air-cooled rack
    $4,800–$14,000 /month

    Fits about four DGX H100 systems. The most common quote for a first GPU deployment.

    120 kW liquid-cooled rack
    $14,400–$42,000 /month

    GB200 NVL72 territory, priced at the air-cooled $/kW. Liquid-ready 20–40 kW racks publish at $130–$400/kW including the premium; no guide prices 100 kW+ separately.

    Per H100, facility cost only
    ~$150–$450 /month

    DGX H100 at 10.2 kW for eight GPUs. Compare with on-demand H100 rental on the rental page.

    Examples use the primary-market span of $120–$350/kW; multiply a market's row by your kW for a market-specific figure. The monthly $/kW rate for liquid-cooled and air-cooled racks is generally the same (Inflect, 1 April 2026).

    Hidden costs the $/kW rate does not include

    Ask every facility to itemize these before comparing headline rates.

    Cross-connects

    Each fiber or copper link to a carrier, cloud on-ramp, or another cage is billed monthly per connection: QuoteColo's 2026 guide puts them at $100–$400 per month each. Training fabrics that span racks may need several.

    Remote hands

    Reboots, cable swaps, and drive replacements are billed hourly, often with a monthly minimum; QuoteColo's 2026 guide puts remote or smart hands at $150–$300 per hour. Ask for the rate card and whether a block of hours is included.

    Liquid-cooling premium

    QuoteColo's 2026 guide prices liquid-ready 20–40 kW racks at a 5–30% premium over air by market, and says RDHx or liquid-ready racks can add $500–$2,000 per rack per month at 30 kW and above. Inflect reports the monthly $/kW is generally the same as air at a site already fitted for liquid, with retrofit cost landing in a one-time charge. Ask which model the quote follows.

    Setup and installation fees

    One-time charges for cage build-out, power whips, PDUs, and initial racking. Negotiable on longer terms.

    Minimum term and ramp

    Most high-density contracts run 24–36 months. Some operators offer a power ramp so you pay for committed kW as hardware arrives; others bill the full commitment from day one.

    Power metering model

    Quotes may be for committed (contracted) kW, metered actual draw plus a base fee, or a blended rate. Compare on the same basis before deciding.

    Skip the estimates. Get real quotes.

    Tell us your kW and region. We check partner facilities with the density you need and send back comparable quotes, itemized, within one business day. You pick one and contract with the facility directly.

    • Quotes normalized to the same power model so they compare cleanly
    • Cross-connect, remote hands, and setup fees called out separately
    • No fee to you; GYGO is paid by the facility

    Requirements first? Read the GPU colocation overview or the H100 colocation page.

    Get facility quotes within one business day

    Six fields. We handle the outreach.

    No fee to you. Quotes come from the facilities; you contract directly with the one you choose.

    GPU colocation cost FAQ

    Published 2026 rate guides put air-cooled GPU colocation at $120–$350 per kW per month across the four primary US markets (Dallas–Fort Worth, Northern Virginia, the Pacific Northwest and the Bay Area). That is the colocation MRC per kW; QuoteColo notes that power billing, cross-connects and remote hands typically add 25–30% on top. Dallas–Fort Worth and the Pacific Northwest sit at the lower end, Ashburn and the Bay Area at the upper end, and secondary markets run $78–$170.

    At $120–$350/kW, a 40 kW air-cooled rack costs roughly $4,800–$14,000 per month before cross-connects, remote hands, power billing and setup fees.

    A 120 kW direct-to-chip position, the density a GB200 NVL72 needs, runs about $14,400–$42,000 per month at the same $/kW as air. Inflect reports the monthly $/kW for liquid-cooled and air-cooled racks is generally the same at a site already fitted for liquid, with retrofit cost landing in a one-time charge; QuoteColo prices liquid-ready 20–40 kW racks at $130–$400 per kW including a 5–30% premium. No published guide prices 100 kW+ positions separately, so treat the figure as a floor and get the facility's quote.

    A DGX H100 draws about 10.2 kW for eight GPUs, so facility cost works out to roughly $150–$450 per H100 per month at $120–$350/kW, excluding hardware, cross-connects, remote hands and power billing.

    Power cost and availability drive most of the spread. Markets with cheap hydro or wind power and spare substation capacity quote lower $/kW; interconnection hubs with tight inventory quote higher. Density also matters: liquid-cooled positions are scarce and priced accordingly.

    No. GYGO is a broker. These are ranges as printed in published 2026 rate guides (QuoteColo, Inflect, CBRE), shown so you can sanity-check quotes. The facilities you choose set the actual price, and you contract with them directly. GYGO is paid by the facility, so there is no fee to you.